Serving Port Orange & Volusia County Β |Β  Call Now: (386) 220-8770
πŸ“ž (386) 220-8770
β˜…β˜…β˜…β˜…β˜… 5.0 Google Rated Β· 14 Google reviews
Fully Insured
Free Estimates
Locally Owned β€” Volusia County
Crew placing a large concrete slab inside forms between neighborhood homes, slab work in Holly Hill, FL
Slabs Β· Holly Hill, FL

Concrete Slab Contractors in Holly Hill, FL

Shed, garage and shop slabs poured to Holly Hill's inspection list. 40+ years of experience. Free estimates.

Fully Insured
Free Quotes
5-Star Google Rated

Get Your Free Holly Hill Estimate

Tell us about your project and we'll get back to you within 24 hours with a detailed, no-obligation quote.

  • 100% free, no-obligation estimates
  • Response within 24 hours
  • Insured and locally owned
  • Transparent pricing β€” no hidden fees
  • Volusia County concrete experience

Quick answer

Holly Hill inspects slabs and foundations as separate stops, and it fines unpermitted right-of-way digging $2,000 a day. A concrete slab contractor in Holly Hill works around both. Port Orange Concrete Co pours shed, garage and shop slabs in Holly Hill, and you get a free written estimate once we've seen the site.

Concrete slab contractor in Holly Hill: slabs get their own inspection

Check the inspection list on Holly Hill's Building Division page. Foundation and Slabs are separate entries, sitting beside Sheds, Driveway, Sidewalk and Accessory Structures. So the pad gets its own inspection, apart from the footing or foundation. We plan the pour date around those stops.

Email your permit application to the division. Big sealed plan sets get walked in. Every application needs certificates of general liability and workers comp insurance, so the paperwork covers the contractor along with the plans. Permits issued from 2024 on are searchable in the Civic Access portal, and that's where you request inspections. A shed slab permit wants two copies of your survey showing where the shed goes. We build our file the same way.

Permit and plan review fees come from City Commission resolution, not the code, so the Building Division gives you the current number for your job value. Our Holly Hill flatwork page lists what else we pour in town.

Crew placing a concrete slab from a pump truck beside a single-story home, slab work in Holly Hill, FL

Where a slab meets the street: the Use Permit, the fine and the joint

Pour a pad beside a driveway or sidewalk and the city's street rules can join the job. City code bars cutting or altering any curb, parkway or sidewalk, or opening a new vehicle entrance, without a permit from the development code administrator. The city's right-of-way page says any work in the right-of-way takes a Use Permit, and the contractor answers for damaged sidewalks and utilities for one year.

It stings. Excavating without that permit costs $2,000 per day, and a contractor caught working without one posts a $1,000 bond with the Chief Building Official. We pull the permit before a shovel crosses the street side of the property line.

The code spells out the sidewalk spec too. Sidewalks use at least 2,500 psi concrete, 4 inches thick and 6 inches thick at driveways. A half inch expansion joint separates the sidewalk from the driveway, the sidewalk from the apron and the apron from the curb, and expansion joints sit no more than 25 feet apart. When a new pad ties into a walk, that joint goes into the layout from the start.

Slabs run $7 to $12 per sq ft on 4 inches, reinforced. These sizes show how the accessory-building lines move the total.

SlabPer sq ftProject totalWhat moves the price
Shed slab, 10 x 12 (120 sq ft)$7 to $12Near the low end of $1,500 to $6,900 (priced to a job minimum)Under 300 sq ft, rear line 5 feet
Garage slab, 20 x 24 (480 sq ft)$7 to $12$3,360 to $5,760Larger than 300 sq ft, so it stays in the buildable area
Workshop slab, 24 x 30 (720 sq ft)$7 to $12$5,040 to $8,640Foundation and slab inspections, canal-side ground
Carport or RV pad, 12 x 35 (420 sq ft)$7 to $12$2,940 to $5,040Right-of-way work at the apron, joint at the walk

Every figure stays a range until we see the site. The detailed written estimate comes before any work starts, and it's free.

Small buildings on a lot here: the 300 sq ft and 30 percent lines

An accessory structure needs an existing principal use, a building permit, and a spot outside the required front yard and side setback. At 300 sq ft or less, it can sit 5 feet off the rear lot line under a 12 foot height cap. Anything larger stays in the buildable area and matches the house. The pad follows whatever stands on it, so the building decides the pad. Thickness, steel and joints are on our slab service page.

The coverage caps are tight. R-1 allows 30 percent on 10,500 sq ft lots, with 30 foot front and rear setbacks and 8 foot sides. R-2 and R-3 allow 35 percent. On a 10,500 sq ft R-1 lot, 30 percent comes to 3,150 sq ft of lot coverage, and the house and your new shed or garage split that number.

The city exempts single-family homes and their customary accessory structures from its stormwater permit, plus additions up to 1,000 sq ft of impervious area that leave runoff alone. That helps a small pad. It doesn't waive the building permit. The county-wide rules are in our Volusia permit guide, so we won't repeat them here.

Smooth concrete garage floor seen from inside an open garage, slab work in Holly Hill, FL

Tidal surge, the B-27 Canal and the LPGA Canal: Holly Hill's flood record

The city sits on the Halifax River's west bank and covers 4.5 square miles, from Sunrise Park at the east end of LPGA Boulevard to the old downtown on Riverside Drive. Its flood page blames tidal surge and rainfall overflow, mostly from the B-27 Canal, the Halifax River, the LPGA Canal and Nova Canal North. The FIRMs are dated 02/19/14 and 09/29/17, with zones X, A and AE. The city joined the National Flood Insurance Program in 1973 and holds a Community Rating System Class 6.

Across the 66 land points sampled, 54.5 percent land in Zone X, 22.7 percent in AE, 12.1 percent in X at 0.2 percent annual chance and 10.6 percent in Zone A. Every AE point with a published base flood elevation came back at 5 feet. That number matters when you pour a slab for a new garage or an addition, so pull your parcel on the FEMA flood map before you pick a height.

One office answers both questions, because the Chief Building Official is also the Floodplain Manager. A concrete slab contractor in Holly Hill asks what elevation the file needs and pours the slab to that.

Myakka-Urban flats, Astatula ridge sand and a tree permit for any tree

The state's soil survey of the city turns up wet flats and dry ridge sand. Myakka-Urban land complex covers 27.3 percent of the land points and drains poorly. Tuscawilla fine sand covers 18.2 percent, also poorly drained. Astatula-Urban land complex covers 16.7 percent and drains fast. In total, 68.2 percent of land points rate "very limited" for dwellings without basements.

On the flats we plan a compacted base, give water a way out from under the pad, and wait for dry ground before we pour. On Astatula ridge sand we compact hard, because loose sand settles under a slab. The Florida Residential Code asks for a 4 inch base course under slabs except on well-drained sand or gravel soils, and the building official says which side of that line you're on.

The city's tree rule has no size floor. Sec. 106-101 requires a removal permit for any tree on any land in the city, whatever the trunk size, and applications map every tree over 6 inches. A pad that crowds even a small tree may need a permit before the stump comes out. Housing is old too. 54.6 percent of units predate 1980 and 835 predate 1950, so a job can start with an old slab to rip out. A concrete slab contractor in Holly Hill sorts out all of that before the first form.

Sources

  1. Building Division, City of Holly Hill
  2. Right-of-Way Permit Applications, City of Holly Hill
  3. Flood Information, City of Holly Hill
  4. Sec. 90-114 Sidewalks, Holly Hill via Municode
  5. Sec. 114-742 Accessory structures, Holly Hill via Municode
  6. Sec. 114-765 Schedule of dimensional requirements, Holly Hill via Municode
  7. Sec. 106-101 Tree removal permit, Holly Hill via Municode
  8. National Flood Hazard Layer, FEMA
Crew screeding a fresh concrete slab inside wood forms on a sandy lot, slab work in Holly Hill, FL

What to Expect, Start to Finish

01

Walk the lot

We measure the pad, mark the trees and lot lines on your lot, and check how close the slab sits to the street.

02

Check the zone

We pull your FEMA zone and your survey's elevations before anyone talks height.

03

Written estimate

Size, base work and price go on paper before we start. It's free.

04

Permit file

We email the application with two surveys and our insurance certificates, then request inspections in the Civic Access portal.

05

Locate, compact, form

Sunshine 811 marks the lines. We compact the base and set forms, and the slab or foundation inspection happens before we pour.

06

Pour, cure, final

We pour and finish the slab, cut joints and protect it while it cures.

What Our Clients Say

5.0 out of 5 from 14 Google reviews See all reviews on Google

  • I called four companies about tearing out our cracked patio and putting in a bigger one. Two never came out, one came out and never sent a number, and one texted a price with nothing else. These guys came out the next morning, measured, and the owner sat at our kitchen table and went through what he would do and why, including why he wanted it a little thicker where the grill sits. The quote matched the bill to the dollar. What stuck with me was the crew. We have a newborn at home and they kept the radio off and the noise down without us asking. They carried every bag through the side gate instead of across the lawn too. Patio came out flat and drains away from the house like it should. Real people doing honest work.
    Jeannicole Β· Google review Β· Oct 2026
  • One panel on the sidewalk had cracked through and was starting to tip. They cut it back to the joints on both sides and poured fresh. The seam is barely there. Quick too, same morning
    Scharika Β· Google review Β· Oct 2026
  • Poured our back patio and a little walkway to the shed. Showed up when they said, worked clean, hauled the old broken stuff off. Couldn't be happier with it
    Sharon Β· Google review Β· Oct 2026
  • Got a stamped concrete walkway with a leaf pattern it’s so pretty i catch myself just staring at it the color they mixed is exactly what I wanted
    Katie Β· Google review Β· Sep 2026
  • Driveway looks great, they scored it in clean sections so it wont crack random like the last one. Smart work"
    Guess Β· Google review Β· Sep 2026
  • Port Orange Concrete Co. was awesome to work with! They took our idea and made it even better than we imagined. The crew was super friendly, showed up on time, and really knew their stuff. Our new patio looks incredibleβ€”we’re beyond happy! Definitely recommend them.
    Jose Β· Google review Β· Dec 2024
  • Awesome job on the foundation! Will hire again πŸ‘ they were quick and on time, and its level and strong.
    Ashley Β· Google review Β· Dec 2024
  • I hired Port Orange Concrete Co. to replace our front walkway, and I’m so glad I did. The team was friendly and really helped us pick the perfect design to match our home. They showed up on time, worked efficiently, and paid attention to all the little details. The walkway turned out beautifully, and our neighbors have already noticed and complimented it. I had a small concern after the project was done, and they addressed it right away, making sure we were completely happy. If you need concrete work, I highly recommend Port Orange Concrete Co.β€”they really care about their customers
    NY Β· Google review Β· Aug 2024
  • They were punctual and professional did a great job on my driveway.Replacement will hire again
    Blake Β· Google review Β· Aug 2024
  • Gave me a great deal on my concrete driveway replacement, and did way better than the team that originally installed it. The owner is friendly, honest, and cheerful. Will use these guys again someday!
    Matthew Β· Google review Β· Aug 2024
  • Got a new concrete driveway and it looks beautiful. THANKS GUYS!!
    Angela Β· Google review Β· Aug 2024
  • Port orange concrete co did a wonderjob job with my new concrete patio, they were respectful of my property and worked hard
    Frank Β· Google review Β· Aug 2024
Call (386) 220-8770

Slabs & Foundations Projects Near Holly Hill

Recent slabs & foundations work in the Holly Hill area.

Crew placing a concrete slab from a pump truck beside a single-story home, slab work in Holly Hill, FL
Smooth concrete garage floor seen from inside an open garage, slab work in Holly Hill, FL
Crew screeding a fresh concrete slab inside wood forms on a sandy lot, slab work in Holly Hill, FL

Frequently Asked Questions

Does a concrete slab contractor in Holly Hill need a separate foundation inspection?
The Building Division lists Foundation and Slabs as separate inspection types. Ask the division which stops your drawings trigger, because a slab with a stem wall or thickened footing is more than a plain pad. We book each stop in the Civic Access portal and plan the pour around it.
How much trouble comes from digging near the street in Holly Hill?
Plenty. Digging in the right-of-way without a Use Permit draws a $2,000 per day fine, and a contractor caught at it posts a $1,000 bond with the Chief Building Official. If your slab runs tight to the apron or sidewalk, we pull the permit first and hold the dig until it's issued.
How big a shed slab can sit 5 feet from my rear line?
Accessory structures of 300 sq ft or less can sit 5 feet from the rear lot line, under a 12 foot height cap. Larger ones stay in the buildable area and match the house. Neither pad goes in the required front yard or the side setback. A 12 x 20 pad is 240 sq ft, so it fits the smaller class.
Do I need a permit to remove a tree for a pad in the city?
Yes. Sec. 106-101 requires a permit to remove, cut down or damage any tree on land inside the city, and the code sets no minimum trunk size. Applications map all trees over 6 inches. Apply before clearing, since a pad site that needs a stump out changes the schedule and the estimate.
Is my lot in a flood zone that changes slab height?
The city lists zones X, A and AE, with AE base flood elevations of 5 feet along the Halifax. Tidal surge and overflow from the B-27 Canal, LPGA Canal and Nova Canal North cause the flooding. Look up your parcel on FEMA's map, then ask the Floodplain Manager what your file needs.
What happens to a sunken old pad on my lot?
It comes out and gets replaced on a compacted base. About 54.6 percent of homes here predate 1980, so old slabs do turn up. We check the ground under it during the free estimate and fold the tear-out and the new pour into one written price.

Ready to pour a slab in Holly Hill?

Call (386) 220-8770 and ask for a concrete slab contractor in Holly Hill who plans around the slab inspection. Send your survey and a sketch, and the estimate is free and written.

πŸ“ž Call (386) 220-8770 Request Quote Online
πŸ“ž Call Now Get Quote
Free Quote