Concrete slab contractors in Deltona and the permit for every added square foot
Deltona's driveway expansion code, Sec. 110-810, requires a building permit when impervious materials or designated parking area additions go onto any residential lot. A second driveway, or an expansion of the first, takes an application reviewed by Planning and Development Services. It has to show the materials and where the concrete apron sits in the right-of-way.
The limits are spelled out. Parking stops at the driveway plus room for two more spaces, 380 sq ft or 40 percent of the front yard, whichever is less. No driveway may cover more than 40 percent of the front yard or pass 24 feet wide, and none may reach into the side yard setback. The single-family right-of-way utilization fee in the city's 2026 fee schedule is $50.
Whoever holds the permit answers for any damage to the edge of pavement, turf, sidewalks, meter boxes and mailboxes. Applications go through the Building Services Division online portal. When your job needs a permit, we pull it, and we plan the truck's path around all of those.




