Commercial concrete in Ormond Beach: the curb cut is a permit of its own
Paperwork for a commercial lot looks inside the property line. In Ormond Beach, the entrance gets its own approval. Land Development Code Section 3-25(c)(2) says no curb gets cut or altered, and no point of access or opening for vehicles onto a public road gets established, without a permit. The Site Plan Review Committee approves it and the chief building official issues it. FDOT or the county issues it instead when the road belongs to them.
Spacing matters too. A lot under 65 feet wide gets one access point. From 65 to 200 feet, it gets two. No driveway may sit within 50 feet of a local-to-local street intersection, measured from the property line at the corner to the near edge of the driveway. On collectors and arterials that distance is 60 to 90 feet. Mark every one of those distances on your survey before you fall for a site plan. Move the entrance and you move the concrete, the drainage and the walk. So any commercial concrete in Ormond Beach gets planned around the entrance first. For the rest of the slab and pad work, see our commercial concrete page.