Serving Port Orange & Volusia County Β |Β  Call Now: (386) 220-8770
πŸ“ž (386) 220-8770
β˜…β˜…β˜…β˜…β˜… 5.0 Google Rated Β· 14 Google reviews
Fully Insured
Free Estimates
Locally Owned β€” Volusia County
Concrete slab with anchor brackets in front of a steel building frame, pole barn slab work in New Smyrna Beach, FL
Pole Barn & Barndominium Slabs Β· New Smyrna Beach, FL

Pole Barn Barndominium Concrete Slabs New Smyrna Beach, FL

We pour barn floors and barndominium slabs on New Smyrna Beach lots, inside the city or out in the county. Free written estimates.

Fully Insured
Free Quotes
5-Star Google Rated

Get Your Free New Smyrna Beach Estimate

Tell us about your project and we'll get back to you within 24 hours with a detailed, no-obligation quote.

  • 100% free, no-obligation estimates
  • Response within 24 hours
  • Insured and locally owned
  • Transparent pricing β€” no hidden fees
  • Volusia County concrete experience

Quick answer

A pole barn barndominium slab in New Smyrna Beach goes through the city only if your lot sits inside it. Since July 2022, Volusia County permits the unincorporated land around the city, and the city wants the contractor to pull the permit. Port Orange Concrete Co pours the slab either way. You get a free written estimate after we see the site.

City or county permits for a pole barn barndominium slab in New Smyrna Beach

Volusia County took over permitting, code enforcement and hearings for unincorporated properties around the city on July 1, 2022, under an Interlocal Service Boundary Agreement. Inside the city, Building and Inspections works under the 2023 Florida Building Code, 8th Edition. Every application goes through its EnerGov self-service portal.

The city's FAQ asks owners to let the contractor pull the permit in the contractor's name. It calls a contractor who asks you to pull a homeowner permit a sign of an unlicensed operator. A permit also expires after 180 days if no required inspection has been approved, so hold off filing until your slab date is real. We pull the permit when your job needs one. Not sure which side of the line your lot is on? Ask the city first. Then read the Volusia County concrete permit guide for the county path.

The coastal setback line: where the city bans slabs, sheds and pavers

The city's Coastal Construction Setback Line sits in the same place as the state's control line. LDR 703.02 bans three things seaward of it: any part of a principal building, accessory structures "including but not limited to decks, patios, garages, sheds, and gazebos," and hardscape like pavers and planters. Dune walkovers and some seawalls and fences are exempt, with a building permit.

For anything else seaward, you'd ask the planning and zoning board for a variance. The board has to deny it if any listed criterion goes unmet. About 10.4 km of the state line runs inside the city, a longer stretch than Daytona Beach or Ormond Beach has. FDEP lists an erosion area from R160.8 to R207.8 along the Bethune Beach side. On a beachfront parcel, a barn or barndominium floor starts as a variance request. Our beachside concrete guide walks through the review.

Below are our Volusia County ranges for a pole barn barndominium slab in New Smyrna Beach. Your footprint and the ground under it set the total.

JobPer sq ftProject totalWhat moves it
Barn floor, 24 x 30 (720 sq ft)$6 to $11$4,320 to $7,920Fill depth over soft ground
Barn floor, 30 x 40 (1,200 sq ft)$6 to $11$7,200 to $13,200Posts, drainage and truck reach
Barndominium monolithic slab (1,008 sq ft)$9 to $15$9,072 to $15,120Flood elevation and plumbing rough-in
Barndominium monolithic slab (2,000 sq ft)$9 to $15$18,000 to $30,000Footprint shape and edge thickening

Every number comes with a free written estimate, written after we see the site, your survey and the kit drawings.

Concrete pole barn slab with post anchor brackets on a cleared sandy site, pole barn slab work in New Smyrna Beach, FL

Gator muck, Hydraquents and Pomona-St. Johns: the ground under a barn pad

Soil sampling here comes back wet. Pomona-St. Johns complex and Hydraquents each cover 9.6% of points and drain very poorly. Gator muck shows at 4.8%, and Myakka fine sand, at 8.0%, drains poorly. By drainage class, 36.8% of points are very poorly drained and 31.2% poorly drained, and 67.2% rate "very limited" for dwellings without basements. Orsino fine sand, moderately well drained, appears at 4.0%. The water bodies include the Indian River, Turnbull Bay and Spruce Creek.

Keep muck and organic fill out from under concrete. Buried organic debris and poorly compacted fill leave depressions that mimic sinkholes, says Florida's geological survey. So we probe the pad. Soft material gets dug out, and clean sand goes back in compacted lifts. Without approval, the Florida Building Code caps clean sand fill under a slab at 24 inches. Exterior footings still sit at least 12 inches below finished grade.

A 60 percent flood footprint: Zone A, AE and the VE pocket

The city carries more flood exposure than Daytona Beach or Port Orange: about 60.0% of sampled points sit in a special flood hazard area. Some of those points fall in coastal high hazard VE zones. Zone A covers 30.4% of points, AE 27.2% and VE 2.4%. AE elevations sit at 5 to 8 ft, with 6 ft the most common, and VE at 9 to 10 ft. The city runs a Community Rating System floodplain plan and posts flood protection help on its site.

That changes the slab. Outside coastal zones, the Florida Building Code sets a home's lowest floor at base flood elevation plus 1 foot. In VE and Coastal A zones, buildings go up on pilings or columns, so a conventional slab-on-grade barndominium isn't the foundation there. A flood zone also voids the HB 803 under-$7,500 exemption for the whole property. Look up your parcel on the FEMA flood map viewer before you order a kit.

Workers finishing a large slab with plumbing stub-outs and rebar edges on sandy ground, pole barn slab work in New Smyrna Beach, FL

Cranes, driveway caps and the frontage sidewalk on a city lot

Will your erector set steel with a crane? Then contact the airport first: the city says to contact the New Smyrna Beach Municipal Airport before permitting, since the FAA wants notice. Let your builder know early, so the pour date and the erection date don't collide.

Driveway rules get specific. A single-family driveway must be at least 8 ft wide, and it can't run wider than 40 percent of the lot width at the front setback line, and 30 ft at the property line. Paved and unpaved driveways both count toward lot coverage, and only a circular driveway can widen across the front of the house. New development and additions also have to install a public sidewalk along all road frontage, 6 inches inside the right-of-way line. The alternative is paying into the sidewalk account per linear foot of frontage minus the driveway and apron width. Build a barndominium and that conversation is yours. Our city sidewalk contractors pour the frontage walk.

Historic districts, oaks and the Venetian Bay to Westside spread of lots

The older part of town rests on two National Register districts. One is the roughly 100 acre New Smyrna Beach Historic District around Riverside Drive. The other is the Coronado district on Flagler Avenue. On local landmarks or contributing structures in a local historic district, exterior alterations and new construction need a Certificate of Appropriateness from the Historic New Smyrna Beach Preservation Commission. The city's own update says it isn't proposing new design rules for the National Register districts.

Trees are the other gate. A tree 36 inches across is a historic tree. Specimen status begins at 12 inches for turkey oak and 18 inches for other oaks, maples, hickories and elms. Lots run from Venetian Bay, with 1,405 single-family parcels, to Westside, Turnbull Estates and Cedar Dunes, so pad size and truck access change street by street. Other slabs on the same lot are covered by the concrete slab contractors and our town page. The slab overview has the sequence. That's the order for any pole barn barndominium slab in New Smyrna Beach, historic district or not.

Thickened-edge concrete pad on a gravel base on a wooded rural lot, pole barn slab work in New Smyrna Beach, FL

What to Expect, Start to Finish

01

City or county

We find out which office permits your lot, and whether the coastal setback line touches it.

02

Flood and soil check

We pull the flood zone and probe the pad for muck before the estimate goes in writing.

03

Permit in our name

If the job needs a permit, we pull it through EnerGov in the contractor's name, as the city asks.

04

811, fill, steel

Once Sunshine 811 clears, we place compacted fill, the retarder, steel and anchor layout.

05

Pour around the crane date

We pour, finish and cure the slab, and we set the date around your erector's crane notice.

What Our Clients Say

5.0 out of 5 from 14 Google reviews See all reviews on Google

  • I called four companies about tearing out our cracked patio and putting in a bigger one. Two never came out, one came out and never sent a number, and one texted a price with nothing else. These guys came out the next morning, measured, and the owner sat at our kitchen table and went through what he would do and why, including why he wanted it a little thicker where the grill sits. The quote matched the bill to the dollar. What stuck with me was the crew. We have a newborn at home and they kept the radio off and the noise down without us asking. They carried every bag through the side gate instead of across the lawn too. Patio came out flat and drains away from the house like it should. Real people doing honest work.
    Jeannicole Β· Google review Β· Oct 2026
  • One panel on the sidewalk had cracked through and was starting to tip. They cut it back to the joints on both sides and poured fresh. The seam is barely there. Quick too, same morning
    Scharika Β· Google review Β· Oct 2026
  • Poured our back patio and a little walkway to the shed. Showed up when they said, worked clean, hauled the old broken stuff off. Couldn't be happier with it
    Sharon Β· Google review Β· Oct 2026
  • Got a stamped concrete walkway with a leaf pattern it’s so pretty i catch myself just staring at it the color they mixed is exactly what I wanted
    Katie Β· Google review Β· Sep 2026
  • Driveway looks great, they scored it in clean sections so it wont crack random like the last one. Smart work"
    Guess Β· Google review Β· Sep 2026
  • Port Orange Concrete Co. was awesome to work with! They took our idea and made it even better than we imagined. The crew was super friendly, showed up on time, and really knew their stuff. Our new patio looks incredibleβ€”we’re beyond happy! Definitely recommend them.
    Jose Β· Google review Β· Dec 2024
  • Awesome job on the foundation! Will hire again πŸ‘ they were quick and on time, and its level and strong.
    Ashley Β· Google review Β· Dec 2024
  • I hired Port Orange Concrete Co. to replace our front walkway, and I’m so glad I did. The team was friendly and really helped us pick the perfect design to match our home. They showed up on time, worked efficiently, and paid attention to all the little details. The walkway turned out beautifully, and our neighbors have already noticed and complimented it. I had a small concern after the project was done, and they addressed it right away, making sure we were completely happy. If you need concrete work, I highly recommend Port Orange Concrete Co.β€”they really care about their customers
    NY Β· Google review Β· Aug 2024
  • They were punctual and professional did a great job on my driveway.Replacement will hire again
    Blake Β· Google review Β· Aug 2024
  • Gave me a great deal on my concrete driveway replacement, and did way better than the team that originally installed it. The owner is friendly, honest, and cheerful. Will use these guys again someday!
    Matthew Β· Google review Β· Aug 2024
  • Got a new concrete driveway and it looks beautiful. THANKS GUYS!!
    Angela Β· Google review Β· Aug 2024
  • Port orange concrete co did a wonderjob job with my new concrete patio, they were respectful of my property and worked hard
    Frank Β· Google review Β· Aug 2024
Call (386) 220-8770

Pole Barn & Barndominium Slabs Projects Near New Smyrna Beach

Recent pole barn & barndominium slabs work in the New Smyrna Beach area.

Concrete pole barn slab with post anchor brackets on a cleared sandy site, pole barn slab work in New Smyrna Beach, FL
Workers finishing a large slab with plumbing stub-outs and rebar edges on sandy ground, pole barn slab work in New Smyrna Beach, FL
Thickened-edge concrete pad on a gravel base on a wooded rural lot, pole barn slab work in New Smyrna Beach, FL

Frequently Asked Questions

Can I pull my own permit for a barn slab in the city?
The city's FAQ asks owners to have the contractor pull the permit in the contractor's name, and it names a contractor asking you to pull a homeowner permit as a warning sign. We pull the permits on our slab jobs. Plan for the permit expiring after 180 days if no required inspection gets approved.
Is my address in the city or the county for a barn slab?
Land outside the city limits but nearby is unincorporated. Since July 2022, Volusia County handles its permitting, code enforcement and hearings under the boundary agreement. Before you file, check with the city's Building and Inspections office. If you land on the county side, the county's own zoning and flood rules apply.
Can I pour a barn slab seaward of the coastal setback line?
Not without a variance. Seaward of the line, the code bans principal buildings, accessory structures such as sheds and garages, and hardscape such as pavers. If any listed criterion goes unmet, the planning and zoning board must deny the variance. Dune walkovers and some seawalls and fences are exempt with a permit.
How does a flood zone change a pole barn barndominium slab in New Smyrna Beach?
A flood zone sets floor height, and sometimes the foundation type. In AE and A zones, the lowest floor goes at base flood elevation plus 1 foot. In VE zones, buildings sit on pilings or columns instead of slab-on-grade. About 60 percent of sampled city points are in a flood zone, and the HB 803 exemption doesn't apply there.
Does a barndominium in the city need a frontage sidewalk?
New development and additions must install a public sidewalk along road frontage, 6 inches inside the right-of-way line. If the city engineer finds that impractical, the owner pays into the sidewalk account per linear foot of frontage minus driveway and apron width. Ask Building and Inspections which one fits your lot.
Do cranes near the city airport need notice?
Yes. The city says contractors using a crane should contact the municipal airport before permitting, because the FAA wants notice. Steel barndominiums and tall pole barns are where that bites. Tell your erector early, so the slab is poured and cured before the crane date. Once you have the schedule, we'll fit our pour to it.

Barn slab estimate in New Smyrna Beach

Planning a pole barn barndominium concrete slab in New Smyrna Beach? Call (386) 220-8770, or send your survey and kit drawings, for a free written estimate.

πŸ“ž Call (386) 220-8770 Request Quote Online
πŸ“ž Call Now Get Quote
Free Quote