Concrete driveway contractors in Edgewater: grade stakes first, pour second
Edgewater puts a gate between you and the truck. The city's Right of Way/Stormwater/Fill Application covers any driveway that touches the right-of-way. It says plainly that an inspection is required prior to the pour, and that the Stormwater Department sets elevation grade stakes before anyone grades.
So the job runs in a set order. We file the application, get the stakes set, grade to them, call the inspection, and only then book the pour. The right-of-way use permit is $75 on the city fee schedule and a repeat inspection is $50, so a missed stop costs real money. On an unpaved road the driveway runs about 15 feet past the property line. On a paved road it has to meet the street.
Dig out your survey before the estimate visit. It saves us a trip and shows whether a new driveway fits under the 60 percent cap. Any concrete driveway contractor in Edgewater should ask you for it up front. Our driveway service page covers thickness, reinforcement and finish choices.